Oil boiler moving and rigging
We prepared the oil boiler in Savon Voima’s building for moving and rigging, then moved it out intact so that it could be reused.
We demolish Finland’s most challenging sites and make sure that everything that was once built can serve society again and again.
Delivering challenging demolition projects safely and to a high standard is true superhero work. Our almost 40 years of solid experience on Finland’s most challenging demolition sites guarantees that there are no compromises on the outcome of your demolition project.
Our Massive Force is built on our top-class equipment and decades of expertise. We demolish even the largest structures in a controlled way, as if they were Lego bricks.
We’re not immune to hazardous materials, but we know exactly how to handle them safely.
There’s nothing magical about our risk management – it’s based on careful anticipation and nearly 40 years of experience in challenging working environments. We spot risks before they arise and ensure safety on every project.
Safety is our number one priority. We don’t have an invisible force field, but our commitment to health and safety ensures that everyone on site and in the surrounding area stays safe.
We can’t control time, but we arrive at lightning speed and work whenever you need us. We demolish in record time, even round the clock, if it means we can spare you the costs of a production stoppage.
In every demolition material, we see the raw material of the future. We maximise the recovery rates of our demolition projects to nearly 100%.
We became demolition contractors, not bankers – but we handle materials worth millions as if they were our own. Everything of value stays safe throughout our projects.
7
Delivering challenging demolition projects safely and to a high standard is true superhero work. Our almost 40 years of solid experience in challenging working environments guarantees that there are no compromises on the outcome of your demolition project.
99.12%
In 2025, only 0.12% of our demolition materials went to final disposal.
22,626.26
In 2025, recycling demolition materials generated significant avoided emissions (t CO₂e) – in other words, through material recovery we avoid more emissions than our operations produce.
79
Our 2025 NPS shows that our clients are satisfied with our services and are happy to recommend them.
We prepared the oil boiler in Savon Voima’s building for moving and rigging, then moved it out intact so that it could be reused.
We dismantled the old slab transfer car track at Outokumpu’s hot rolling mill and prepared the base for the new rails, working around the clock during a maintenance outage.
We dismantled MS-Steel’s crane on a fast-track schedule.
Stora Enso Oyj, Imatra Mills, thanks Umacon for its active safety work and for promoting safety culture at Stora Enso’s Imatra Mills.
Contact us in whatever way suits you best and we’ll get back to you as soon as possible. Our experienced project managers are there to support you, even if your demolition project is still on the drawing board.
"*" indicates required fields
We believe that sustainability is built on wise choices made again and again in everyday work. Getting them right requires staff to have the know-how they need and practices that work.